0:05 Welcome to Broadbeach Waters. This is our latest custom new build, which consists of five bedrooms, lovely
0:12 stairs, custom floors, custom kitchens and a beautiful outlook.
0:17 Hi Gordon, how are you going? I just want to introduce our client who has taken delivery of his new home, Gordon Ward.
0:25 Thanks, Heath. Pleased to be here and see the results of all the hard effort over the last 12 months. It’s a fabulous product, and I’m really happy with what you guys have done.
0:33 Amazing. I guess this has been a process of nearly two years now, hasn’t it? By the time you started with your drawings and all the pre-build information, to the stage we’re at now,
0:43 you’re enjoying it. So, how was it?
0:44 Like any project like this, there’s a long lead time getting the design right and making your decisions early about which process you want to go
0:52 through. I compared building with a project home against a custom build. I’d seen Symcorp building nearby—a new house that you built—and it was a
1:00 great job. You were also recommended by my designer, so I decided to run with Symcorp after a lot of design work.
1:08 Here we are, probably 18 months later.
1:10 There you go. We committed to a 12-month build. How do you think we performed?
1:15 Well, I’m pretty disappointed. You guys were two days late.
1:18 No, fantastic effort. It’s certainly been a far better experience with you guys than what I’ve experienced with a well-known project builder.
1:25 You’ve mentioned that you’ve done other builds. Were there many differences in our processes, our styles and the things that we did compared with the other builders?
1:33 I think the biggest difference is that you get your own personality embodied in the build. The builder sees the
1:40 concept, sees the vision and then makes it a reality. It’s so different from taking a project house, like a Metricon property, for instance,
1:49 where it’s all set out for you and you’re going to get a standard product. Here, it’s something unique, individual and quite special.
1:56 We try to give you a process that allows you to remain involved while the build is happening. Did you get much more say, or did you come up
2:04 with many more ideas or anything different through that? I think the key things throughout the building process were having a project manager dedicated to
2:12 the build who didn’t change. You had excellent staff working for you, which was important, and great communication from day one and throughout
2:20 the design process. The selections we made about stonework, the size of the house and the dimensions of
2:28 rooms were all considered in great detail upfront. We then had weekly meetings on-site after
2:35 the build really got going, so that was important. Any issues whatsoever were addressed with me, so I really appreciated the level of
2:42 feedback and the ability to influence design choices along the way.
2:47 Okay. I was involved with you quite early on, obviously, around quoting, estimating and getting the sale for
2:54 Symcorp. You obviously had a budget in mind. Were we able to help you obtain that budget, tweak things or
3:01 do anything you needed to help you get the right amount that you wanted? There was a lot of collaboration going
3:08 through the project design. The initial budget I had ended up being exceeded by a reasonable amount, but that was through conscious
3:17 decisions made for the sort of house I wanted to build. It turned out to be much more of a luxury product than where I was initially targeting it, which was better than a
3:26 Metricon house, for instance, but not in that luxury range. We ended up above budget, but after we pushed the button on the contract and
3:34 started building, the total build cost was within the build cost plus contingency. I was happy with that result.
3:40 Awesome. What do you think about the level of finishes in this house?
3:44 Excellent. That’s all I can say. I’m very, very happy. I think it’s top quality. I can’t pick any faults, and the attention to detail was there
3:53 all the way through. The fixes you have to make at the end are very limited. I think it’s a superb finish. So Gordon, I guess it was a
4:00 nine-month process to get from your first meeting with us to signing a contract and starting the
4:08 build. What was your first stage of trying to evaluate where you wanted to spend and how you wanted to work with this?
4:15 What I’d done initially was get a costing and a detailed design and specification from a project home builder. I had a fairly clear idea of
4:23 what I wanted upfront, and I had a budget. My wife also had a budget, which I had to stick with. From that, I had the idea of looking at
4:32 a custom build because it gets you a better-quality finish. You will achieve a better sale price if you decide to take that next step. When I met with you guys, it was
4:41 about understanding what the cost was on a per-metre basis and how a design similar to the project home I’d
4:48 come up with could be constructed, as well as what the total cost was going to be. Timing was also important—how quickly could that build take place?
4:55 Timing is critical because time is money and you’ve got funding costs. The quicker you can get a house built, the better. From there,
5:02 we went into more detailed design once we determined that the initial budget was in the right ballpark.
5:08 Yep. Through that detailed design process, I also involved an interior designer at that stage who
5:16 spent a lot of time and effort working on the detailed drawings so we could get very specific costings for the build. We were then able to work out what
5:24 the final costs were going to be. There were a number of iterations, even in that process. I think there were seven revisions of the quote before we finally landed on the final
5:33 design and costing. Our process goes through three stages where we talk about square-metre costs.
5:41 From there, we typically go into our allowance quotes. It’s a much more detailed quote because, if you’re going to work with square-metre rates,
5:49 that’s very broad and open in terms of finishes, structures and things like that. I guess we would have gone through that stage with you, where we
5:56 discussed our square metre costs. Then we moved on to an allowance quote, still staying within the budget you were happy with, before moving into
6:03 fixed pricing. We get a lot of clients who can spend nine or 12 months doing all this by themselves without engaging a builder,
6:10 and then get to the end and can’t afford it. That’s the whole reason we go through that process
6:16 ourselves. How was it for you? I think it’s critical because you need to have that detailed design
6:24 completed to be able to cost the build properly. You can’t go to a number of builders with a detailed design and ask them to spend time and
6:32 money doing it without knowing whether they’re going to get a contract at the end. This was a decision of faith and, to some extent, based on
6:40 recommendations I’d received to run with Symcorp.
6:42 I’d picked the builder, so let’s work with them to try to get the best build we can. Let’s do smart things along the way to reduce costs where possible, which we
6:51 did with the engineering, flooring that we sourced from Malaysia and double-glazed windows that we sourced from China. There were innovations as we went through the process that allowed us to
7:00 bring the cost down. But when you go into a build like this, it’s critical to understand or be aware that you’re likely to exceed your own
7:07 budget, which we did considerably. You have to be comfortable that you’re probably going to end up spending more than you really want to,
7:15 but is it worth it to get the product and the finish level that you also want? I think we’ve achieved that result here—that harmony.
7:23 In conclusion, I’m really very happy with the result we’ve achieved through Symcorp. Like yourselves, I’m very proud of what we’ve managed to
7:32 achieve, and I’d certainly recommend Symcorp to any future client.
7:35 Appreciate it. No problem. Thanks again, mate.